“Whenever we had a question, it was always re-assuring to know that the Stabb team was available to respond immediately.”
A former 5 star ladies only spa in a period listed Belgravia building comprehensively transformed into beautiful office space.
Existing period features including four metre high ceilings and a double height Boardroom hallway facilitated the design of clerestory glazing and display plinths for the ship models. Timber floors to front of house areas and acoustic wall treatments to TV surrounds.
“James and his team listened carefully to our requirements, and developed a fantastic layout and a stunning design. As we moved the design forward, the Stabb team were helpful in cost engineering. I would further add Stabb were hugely supportive and flexible through a complicated period for signing our lease (due to COVID), and fair and pragmatic with our contract with them. Whenever we had a question, it was always re-assuring to know that the Stabb team was available to respond immediately. All the work was completed exactly on time and to specification. The resulting office has a real “wow factor” when you walk into it. We would strongly recommend Stabb as a fitout provider.”
Tim Sanger
Managing Director Scorpio Group
Location:
11A West Halkin St
Belgravia
SW1
Project Size:
4,000 ft2
Sector:
Shipping
Timeframe:
12 Weeks